fbpx

Case Study

Home > Case Study

Case Study

chiller installation at manufacturing plant

Temporary Chiller Installation – Manufacturing Plant

One of Irelands leading plastics manufacturing facilities had a fault on their main chilled water process cooling chiller that required a replacement component with a long lead time. Having ascertained the existing chiller component would take some weeks to be supplied, the production process necessitated the supply of a temporary chiller to provide the clients manufacturing process with continuous chilled water. The project involved the design, assembly, supply, installation and commissioning of a system to provide cooling. Cross Hire Services were contacted by the customer and we were on site within a few hours to carry out a survey of the client’s requirements. Our engineers quickly assessed the clients process and a 300kw temporary chiller and associated pipework accessories were dispatched to site. Our team fully supplied, installed, and commissioned the rental chiller solution and the customers operations were restored to full production within 24 hrs of the client contacting Cross Hire Services. If you require a hire chiller solution or you are just making contingency plans for your operation, please contact one of our technical support team who would be glad to provide a free consultation to help us design a safety net for your business operations. Hire chillers are available for short- or long-term projects. We will customise a chiller rental solution to your specific requirements and business needs.

Temporary Chiller Installation – Manufacturing Plant Read More »

One of Irelands leading plastics manufacturing facilities had a fault on their main chilled water process cooling chiller that required a replacement component with a long lead time. Having ascertained the existing chiller component would take some weeks to be supplied, the production process necessitated the supply of a temporary chiller to provide the clients manufacturing process with continuous chilled water. The project involved the design, assembly, supply, installation and commissioning of a system to provide cooling. Cross Hire Services were contacted by the customer and we were on site within a few hours to carry out a survey of the client’s requirements. Our engineers quickly assessed the clients process and a 300kw temporary chiller and associated pipework accessories were dispatched to site. Our team fully supplied, installed, and commissioned the rental chiller solution and the customers operations were restored to full production within 24 hrs of the client contacting Cross Hire Services. If you require a hire chiller solution or you are just making contingency plans for your operation, please contact one of our technical support team who would be glad to provide a free consultation to help us design a safety net for your business operations. Hire chillers are available for short- or long-term projects. We will customise a chiller rental solution to your specific requirements and business needs.

Our team was tasked with provide temporary event heating for a major book launch in Galway

Heating Case Study: Galway Book Launch

The Cross Hire team was tasked with providing a temporary event heating solution for a major book launch in Galway. Our client got in touch with us directly, asking us to heat their events centre area over a weekend period. The forecast was for a cold, damp weekend, so it was vital that our team was able to deliver adequate temperature control in a timely manner. Download our case study and find out more about yet another great example of our ability to deliver effective solutions for all our clients. Heating Case Study Fact File: CLIENT: Confidential LOCATION: Galway SERVICE/EQUIPMENT: • Hot House Ace 200 indirect fired heater • 1000ltr Fuel Tank • 40m ducting • 50m power cable DURATION: 3 Days Cross Hire can provide temporary heating and much, much more for events and other short-term needs. One call, one email – one right solution. Call or email our team today.

Heating Case Study: Galway Book Launch Read More »

The Cross Hire team was tasked with providing a temporary event heating solution for a major book launch in Galway. Our client got in touch with us directly, asking us to heat their events centre area over a weekend period. The forecast was for a cold, damp weekend, so it was vital that our team was able to deliver adequate temperature control in a timely manner. Download our case study and find out more about yet another great example of our ability to deliver effective solutions for all our clients. Heating Case Study Fact File: CLIENT: Confidential LOCATION: Galway SERVICE/EQUIPMENT: • Hot House Ace 200 indirect fired heater • 1000ltr Fuel Tank • 40m ducting • 50m power cable DURATION: 3 Days Cross Hire can provide temporary heating and much, much more for events and other short-term needs. One call, one email – one right solution. Call or email our team today.

Scroll to Top